ezTrak Record Details

Detailed Information for Project/Case#:2018P01085 at 721 Main st, Cinc

Please select the relevant tab below to view more information.

Permit Issued - 4/11/2018 12:00:00 AM.

General Information:
Type2019 Building Combo
Sub TypeNew Commercial
TitleNAP 8TH & MAIN LLC
DescriptionDEMOLITION OF EXISTING BUILDING AND CONSTRUCTION OF NEW 10,000 SQF RESIDENTIAL APARTMENT BUILDING - SITE WORK AND CIVIL ENGINEERING
Location721 MAIN ST
Parcel Number007900010029
Key Dates:
Applied DateMonday, February 5, 2018
Current StatusISSUED
Status as of 

Approvals:

Please click a heading below to display more detailed information.
12-BPE-Plans Exam APPRVL (Required)
ROUTED FOR REVIEW2/5/2018
Comments:
ROUTING SCREEN UPDATED - BPE
7-Permit Assigned to BPE (Required)
Approved2/6/2018
8-BPE - Review Begun (Required)
Review Started2/9/2018
10-DENIED BPE -Additionl Info Req (Optional)
Task Complete2/9/2018
11-BPE Review Letter Comments (Optional)
Letter Sent2/9/2018
Comments:
1. CBC 1101-21, Policy Directive 44; Indicate the construction phasing for this project.

2. CBC 1101-17.1; Provide separate wrecking permits for each building at each current address as listed on the auditors records. The excavation/fill permits for filling in each respective basement are to be included with each wrecking permit.

3. CBC 1101-19.2, 1101-19.5, Policy Directive ; Correct the current use on the application to indicate VACANT. This is based on the assumption that the site will be cleared upon the issue of the wrecking permits. Correct the description on the application to accurately reflect the scope of work based on the project phase being applied for. If the application calls for a new building, provide the complete plans for the new building. Complete the excavation/fill lines for any excavation or fill applicable to this permit.

4. OBC 1704.2.3, CBC 1101-39.1, 1101-39.2; Plans for the building shall be accompanied by two copies of the site specific Geotechnical Report and a completed Statement of Special Inspections.

5. OBC 106.1.1(12); Provide structural details for the construction of the stormwater detention chamber.

6. CBC 1101-19.4; Locate and identify the electric service line.
9-Front Counter- Revisn Processd (Optional)
Approved3/19/2018
Comments:
REVISED/ REPLACED SETS/ 3 TO SMC/ S&R NEW SHEETS/ FEE
12-BPE-Plans Exam APPRVL (Required)
REVISION3/19/2018
Comments:
REVISION
10-DENIED BPE -Additionl Info Req (Optional)
Task Complete3/21/2018
11-BPE Review Letter Comments (Optional)
Letter Sent3/21/2018
Comments:
1. CBC 1101-21, Complies.

2. CBC 1101-17.1, 1101-19.5, OBC 3303.2, 3303.4; Separate wrecking permits for each building at each current address as listed on the auditors records. These will be applied for under separate applications. The excavation/fill permits if applicable for filling in each respective basement are to be included with each wrecking permit. The basements shall be temporarily filled in. Protective site barriers shall be provided and shown on the plans. Plans shall address the site work sequence in preparation for the foundation permit phase. The excavation /fill sequence of replacing non-prepared fill in the area of the old building basements shall be detailed and presented on the plans. The earth quantities involved shall be calculated and included in the overall site excavation/fill scope.

3. CBC 1101-19.2, 1101-19.5, Correct the detailed scope of work description on the revised application form. The true scope is the excavation/fill to prepare the site for a future 125 Unit Residential Appartment Building and installation of a stormwater detention structure and associated storm utilities. The plans need to state that the two buildings currently on the site will be wrecked under separate permits. Correct the description on the application to accurately reflect the scope of work based on this project phase. De-check anything to do with new building, fire alarm or sprinlers. These items are not being applied for. Sprinkler underground shall be applied for under separate application. The new building will be introduced in the foundation permit. Revise the excavation/fill lines to include the uncontrolled fill in the old building basements. Controllled fill requires Special Inspections.

4. OBC 1704.2.3, CBC 1101-39.1, 1101-39.2; Complies. Make sure we have 3 copies of these items.

5. OBC 106.1.1(12); Provide structural details for the construction of the stormwater detention chamber. This includes design of the chanber foundation and associated reinforcing details. All precast components except standard manholes shall either be completely detailed or approved by the special inspection process for precast items.

6. CBC 1101-19.4; Complies.
9-Front Counter- Revisn Processd (Optional)
Approved3/30/2018
Comments:
REVISION MADE / SHEETS REPLACED / PAGES TO S&R / REST TO SMC / REVISION FEE CHARGED
12-BPE-Plans Exam APPRVL (Required)
REVISION3/30/2018
Comments:
REVISION MADE
12-BPE-Plans Exam APPRVL (Required)
Approved4/5/2018
7-Permit Assigned to BPE (Required)
Task Complete4/5/2018
Comments:
WITH CONDITION
11-BPE Review Letter Comments (Optional)
Letter Sent12/21/2018
Comments:
1. OBC 1010.1.5, 1010.1.6; Sheet C200, NW building corner. The pavement cannot be higher than the finished floor elevatoin of the building.
14-ZPE- Zoning Plan Exam APPRVL (Required)
ROUTED FOR REVIEW2/5/2018
Comments:
ROUTING SCREEN UPDATED - ZPE
137-Record Assigned to ZPE (Optional)
Approved2/5/2018
14-ZPE- Zoning Plan Exam APPRVL (Required)
Not Approved2/14/2018
Comments:
Per Historic Conservation Board Approval, demolition can not be approved until building plans for the new building have been submitted and approved.
138-ZPE - Review Begun (Optional)
Review Started2/14/2018
Comments:
ENTERED WHEN ITEM 139 ENTERED
139-DENIED ZPE -Additionl Info Req (Optional)
Approved3/5/2018
Comments:
(2/14/18 per BFJ) Per Historic Conservation Board Approval, demolition can not be approved until building plans for the new building have been submitted and approved.

Property will require a Consolidation Plat and easements granted by the City for Shell permits.
138-ZPE - Review Begun (Optional)
Approved3/5/2018
Comments:
This property will require a Consolidation Plat
133-ZPE Review Letter Comments (Optional)
Approved3/5/2018
Comments:
(2/14/18 per BFJ) Per Historic Conservation Board Approval, demolition can not be approved until building plans for the new building have been submitted and approved.

Property will require a Consolidation Plat and easements granted by the City for Shell permits.
14-ZPE- Zoning Plan Exam APPRVL (Required)
REVISION3/19/2018
Comments:
REVISION
139-DENIED ZPE -Additionl Info Req (Optional)
Approved3/21/2018
Comments:
Per Historic Conservation Board Approval, demolition can not be approved until building plans for the new building have been submitted and approved.
14-ZPE- Zoning Plan Exam APPRVL (Required)
REVISION3/30/2018
Comments:
REVISION MADE
14-ZPE- Zoning Plan Exam APPRVL (Required)
Approved4/3/2018
50-DOTE Permit & License Center (Required)
ROUTED FOR REVIEW2/5/2018
Comments:
ROUTING SCREEN UPDATED - DOTE
50-DOTE Permit & License Center (Required)
Cond. Approval2/13/2018
Comments:
All work in the right-of-way requires DOTE permits, obtained by DOTE licensed contractors, and must be constructed to City of Cincinnati standards, policies, and procedures.
50-DOTE Permit & License Center (Required)
REVISION3/19/2018
Comments:
REVISION
50-DOTE Permit & License Center (Required)
Cond. Approval3/21/2018
Comments:
All work in the right-of-way requires DOTE permits, obtained by DOTE licensed contractors, and must be constructed to City of Cincinnati standards, policies, and procedures.
50-DOTE Permit & License Center (Required)
REVISION3/30/2018
Comments:
REVISION MADE
50-DOTE Permit & License Center (Required)
Cond. Approval4/5/2018
Comments:
All work in the right-of-way requires DOTE permits, obtained by DOTE licensed contractors, and must be constructed to City of Cincinnati standards, policies, and procedures.
50-DOTE Permit & License Center (Required)
In Review2/27/2019
Comments:
NEED APPROVAL FOR EC
50-DOTE Permit & License Center (Required)
Approved3/18/2019
Comments:
DOTE approval of 2-21-19 engineering change PER JRL
40-Fire Division (Required)
ROUTED FOR REVIEW2/5/2018
Comments:
ROUTING SCREEN UPDATED - FIRE
40-Fire Division (Required)
Disapproved2/12/2018
Comments:
No fire hydrant shown on the site plan provided, at least two are required to be within 400 feet of parts of the structure shown on the site proposal. This does not comply with the fire codes below; for additional information please contact District Chief Fredrick Prather at 513-678-1980.

The minimum GPM requirements for your project is: 1000 GPM at 20 PSI

§ 1229-3. Water Flow Requirements.

An adequate water supply for firefighting purposes, as determined by the fire chief, shall be available for all buildings, structures and parts thereof and for all buildings and structures under construction. Such water shall be supplied from city water mains.

(C.M.C. 1239-3; ordained by Ord. No. 364-1979, eff. Sept. 6, 1979; repealed and reordained as Sec. 1229-3 by Ord. No. 385-1984, eff. Sept. 6, 1984)

Analogous to CFPC 80-02; ordained by Ord. No. 464-1971, eff. Jan. 21, 1972; r. Ord. No. 364-1979, eff. Sept. 6, 1979.


§ 1229-5. Location of Buildings and Structures.

(A) Except as provided in Sections 1229-5(B) and (C), all buildings and structures shall be so located that all parts thereof are not more than 400 feet from not less than two readily accessible public or private fire hydrants.

(B) Except as provided in Section 1229-5(C), all buildings and structures in areas where the required fire flow, as determined by the fire chief, is not more than 4,500 gallons per minute shall be so located that all parts thereof are not more than 400 feet from not less than one readily accessible public or private fire hydrant.

(C) All dwelling houses or other minor use buildings or structures shall be so located that all parts thereof are not more than 500 feet from not less than one readily accessible public or private fire hydrant, unless a greater distance is specifically approved by the fire chief.

(C.M.C. 1239-5; ordained by Ord. No. 364-1979, eff. Sept. 6, 1979; repealed and reordained as Sec. 1229-5 by Ord. No. 385-1984, eff. Sept. 6, 1984)

Analogous to CFPC 80-03; ordained by Ord. No. 464-1971, eff. Jan. 21, 1972; r. Ord. No. 364-1979, eff. Sept. 6, 1979.


§ 1229-7. Public Fire Hydrant Spacing.

Public fire hydrants which are necessary to supply the fire-fighting water required by Section 1229-3 shall be spaced or located as follows:

(a) In areas where the required fire flow, as determined by the fire chief, is more than 4,500 gallons per minute, fire hydrants shall not be more than 300 feet apart.

(b) In areas where the required fire flow, as determined by the fire chief, is not more than 4,500 gallons per minute, fire hydrants shall be not more than 400 feet apart.

(C.M.C. 1239-7; ordained by Ord. No. 364-1979, eff. Sept. 6, 1979; repealed and reordained as Sec. 1229-7 by Ord. No. 385-1984, eff. Sept. 6, 1984)

Analogous to CFPC 80-04; ordained by Ord. No. 464-1971, eff. Jan. 21, 1972; r. Ord. No. 364-1979, eff. Sept. 6, 1979.


§ 1229-9. Private Fire Hydrants.

Private fire hydrants where required to meet the provisions of Section 1229-5 shall be located, installed and maintained in accordance with the following:

(a) Private fire hydrants shall be installed in accordance with all applicable laws, ordinances and rules and regulations of the Cincinnati water works and the following:

(1) All private fire hydrants shall have an approved shutoff valve installed in the fire hydrant lead not more than 10 feet from the fire hydrant. Such shutoff valve shall be accessible at all times;

(2) All private fire hydrants shall be installed not closer than two feet, nor more than five feet from a street, roadway or driveway conforming with Section 1229-13.

(b) All private fire hydrants shall be maintained in proper working order by the owner;

(c) An inspection and flow test shall be conducted annually as prescribed by the fire chief;

(d) All private fire hydrants shall be accessible at all times, for firefighting purposes.

(C.M.C. 1239-9; ordained by Ord. No. 364-1979, eff. Sept. 6, 1979; repealed and reordained as Sec. 1229-9 by Ord. No. 385-1984, eff. Sept. 6, 1984)

Analogous to CFPC 80-05; ordained by Ord. No. 464-1971, eff. Jan. 21, 1972; r. Ord. No. 364-1979, eff. Sept. 6, 1979.


§ 1229-11. Access for Firefighting.

(A) Where access for firefighting purposes is required by this code, such access shall be provided by means of streets, roadways or driveways conforming to Section 1229-13.

(B) Where access for firefighting purposes is required by the Cincinnati Ohio Building Code, such access, in addition to complying with all the requirements of the Cincinnati Ohio Building Code, shall be by means of streets, roadways or driveways conforming to Section 1229-13.

(C) Access from fire hydrants to structures shall be approved by the fire chief.

(C.M.C. 1239-11; ordained by Ord. No. 364-1979, eff. Sept. 6, 1979; repealed and reordained as Sec. 1229-11 by Ord. No. 385-1984, eff. Sept. 6, 1984)

Analogous to CFPC 80-06; ordained by Ord. No. 464-1971, eff. Jan. 21, 1972; r. Ord. No. 364-1979, eff. Sept. 6, 1979.


§ 1229-13. Access Streets, Roadways or Driveways.

Access streets, roadways or driveways, where required by Section 1229-11, shall conform to the following:

(a) The width shall be sufficient to permit easy passage of any fire division apparatus, and in no case shall the width be less than 18 feet;

(b) The surface shall be of sufficient strength and type to adequately support any fire division apparatus under any weather conditions;

(c) The curve radii and grade elevations shall be such as to permit any fire department apparatus to negotiate curves and grades under any weather conditions.

(C.M.C. 1239-13; ordained by Ord. No. 364-1979, eff. Sept. 6, 1979; repealed and reordained as Sec. 1229-13 by Ord. No. 385-1984, eff. Sept. 6, 1984)
Analogous to CFPC 80-07; ordained by Ord. No. 464-1971, eff. Jan. 21, 1972; a. Ord. No. 428-1973, eff. Oct. 19, 1973; r. Ord. No. 364-1979, eff. Sept. 6, 1979.



40-Fire Division (Required)
Disapproved2/12/2018
Comments:
The owner is required to provide a site plan with the fire hydrants shown that are within 50 feet of one Fire Department Connection, and also show an additional Fire Department Connection since the structure is a high-rise . This is in addition to there being two readily accessible fire hydrants within 400 feet of all parts of your proposed structure.
The minimum GPM requirements for your project is: 1000 GPM at 20 PSI
Please call me with any questions,
Fredrick A. Prather, District Fire Chief
Cincinnati Fire Department Fire Prevention Bureau
805 Central Avenue Suite 400
Cincinnati, Ohio 45202
Phone: (513) 357-7595, Fax: (513) 357-7579, Cell: (513)-678-1980
fred.prather@cincinnati-oh.gov
Make today a great day!

Cincinnati Fire Prevention Code

§ 1229-5. Location of Buildings and Structures.

(A) Except as provided in Sections 1229-5(B) and (C), all buildings and structures shall be so located that all parts thereof are not more than 400 feet from not less than two readily accessible public or private fire hydrants.

Ohio Fire Code
(L) Section 912 Fire department connections
(1) 912.1 Installation. Fire department connections shall be installed in accordance with the NFPA standard applicable to the system design and shall comply with paragraphs (L)(2)( 912.2 ) to (L)(6)( 912.6 ) of this rule.
Exceptions: Fire department connections are not required for:
1. Limited area sprinkler systems supplied from the domestic water system.
2. Automatic sprinkler systems having less than twenty sprinklers.
(2) 912.2 Location. With respect to hydrants, driveways, buildings and landscaping, fire department connections shall be so located that fire apparatus and hose connected to supply the system will not obstruct access to the buildings for other fire apparatus. The location of the fire department connections shall be approved by the fire code official. After approving the location of the fire department connection(s), the fire code official shall submit this approval to the building code official of the certified building department having jurisdiction.
(a) 912.2.1 Visible location. Fire department connections shall be located on the street side of buildings, fully visible and recognizable from the street or nearest point of fire department vehicle access or otherwise approved by the fire code official. If the fire code official approves a fire department connection location that does not meet the above criteria, the fire code official shall provide this input to the building code official of the certified building department having jurisdiction.
(b) 912.2.2 Existing buildings. On existing buildings, wherever the fire department connection is not visible to approaching fire apparatus, the fire department connection shall be indicated by an approved sign mounted on the street front or on the side of the building. Such sign shall have the letters "FDC" at least 6 inches (152 mm) high and words in letters at least 2 inches (51 mm) high or an arrow to indicate the location. All such signs shall be subject to the approval of the fire code official.
(3) 912.3 Access. Immediate access to fire department connections shall be maintained at all times and without obstruction by fences, bushes, trees, walls or any other fixed or moveable object. Access to fire department connections shall be approved by the fire code official.
Exception: Fences, where provided with an access gate equipped with a sign complying with the legend requirements of paragraph (L)(4)( 912.4 ) of this rule and a means of emergency operation. The gate and the means of emergency operation shall be approved by the fire code official and maintained operational at all times.
(a) 912.3.1 Locking fire department connection caps. The fire code official is authorized to require locking caps on fire department connections for water-based fire protection systems where the responding fire department carries appropriate key wrenches for removal. The fire code official shall notify the building official of the requirement for locking fire department connection caps.
(b) 912.3.2 Clear space around connections. A working space of not less than 36 inches (762 mm) in width, 36 inches (914 mm) in depth and 78 inches (1981 mm) in height shall be provided and maintained in front of and to the sides of wall-mounted fire department connections and around the circumference of free-standing fire department connections, except as otherwise required or approved by the fire code official. The fire code official shall notify the building code official of the certified building department having jurisdiction of any conditions approved by the fire code official that exceed the minimum requirements contained in this paragraph.
(c) 912.3.3 Physical protection. Where fire department connections are subject to impact by a motor vehicle, vehicle impact protection shall be provided in accordance with paragraph (L)(312) of rule 1301:7-7-03 of the Administrative Code.
(4) 912.4 Signs. A metal sign with raised letters at least 1 inch (25 mm) in size shall be mounted on all fire department connections serving automatic sprinklers, standpipes or fire pump connections. Such signs shall read: "AUTOMATIC SPRINKLERS" or "STANDPIPES" or "TEST CONNECTION" or a combination thereof as applicable. Where the fire department connection does not serve the entire building, a sign shall be provided indicating the portions of the building served.
(5) 912.5 Backflow protection. The potable water supply to automatic sprinkler and standpipe systems shall be protected against backflow as required by the plumbing code as listed in rule 1301:7-7-47 of the Administrative Code.
(6) 912.6 Inspection, testing and maintenance. All fire department connections shall be periodically inspected, tested and maintained in accordance with NFPA 25 as listed in rule 1301:7-7-47 of the Administrative Code.
(M) Section 913 Fire pumps
(1) 913.1 General. Where provided, fire pumps shall be installed in accordance with this paragraph and NFPA 20 as listed in rule 1301:7-7-47 of the Administrative Code.
(a) 913.1.1 Minimum suction pressure to be maintained. When a fire pump is installed, the "Ohio Environmental Protection Agency" requires the installation of a low pressure cut-off or a low suction throttling valve to ensure that a minimum of 10 psi is maintained in the suction line while the pump is operating in accordance with rule 3745-95-07 of the Administrative Code.
(2) 913.2 Protection against interruption of service. The fire pump, driver and controller shall be protected in accordance with NFPA 20 as listed in rule 1301:7-7-47 of the Administrative Codeagainst possible interruption of service through damage caused by explosion, fire, flood, earthquake


40-Fire Division (Required)
REVISION3/19/2018
Comments:
REVISION
40-Fire Division (Required)
Approved3/20/2018
40-Fire Division (Required)
REVISION3/30/2018
Comments:
REVISION MADE
40-Fire Division (Required)
Approved4/2/2018
92-Historic Conservation (Required)
ROUTED FOR REVIEW2/5/2018
Comments:
ROUTING SCREEN UPDATED - HIST
92-Historic Conservation (Required)
Not Approved2/14/2018
Comments:
Per Historic Conservation Board Approval, demolition can not be approved until building plans for the new building have been submitted and approved.
92-Historic Conservation (Required)
REVISION3/19/2018
92-Historic Conservation (Required)
Approved3/21/2018
Comments:
Per Historic Conservation Board Approval, demolition can not be approved until building plans for the new building have been submitted and approved.
92-Historic Conservation (Required)
Not Approved3/21/2018
Comments:
Per Historic Conservation Board Approval, demolition can not be approved until building plans for the new building have been submitted and approved.
92-Historic Conservation (Required)
REVISION3/30/2018
Comments:
REVISION MADE
92-Historic Conservation (Required)
Approved4/3/2018
Comments:
Approved. Please refer to letter in CAGIS Docs.
60-MSD Eng-Building Permit Review (Required)
ROUTED FOR REVIEW2/5/2018
Comments:
ROUTING SCREEN UPDATED - MSD
60-MSD Eng-Building Permit Review (Required)
Denied 2/6/2018
Comments:
1 Add invert elevation at tap connection point at the main.
1 Add rim elevation of upstream manhole.

1 Add note: "If lowest level elevation is below rim elevation of upstream manhole, then tap must include backflow
prevention or be pumped to gravity."
1 Your project may change flow to a sewer overflow. Please complete and submit the enclosed Request for Sewer
Availability. You may email it to MSDAvailability@cincinnati-oh.gov. Form may also be completed and submitted at http://www.msdgc.org/downloads/customer_care/permits_and_records/availability_form.pdf
1 Other:1) In order to complete our review, please submit the following items to Jeff Chen at jeff.chen@cincinnati-oh.gov:
" Detention report and calculations.
" Private storm sewer and conveyance design calculations, if applicable.
" Miscellaneous calculations, modeling reports, drainage maps, and assumptions, as applicable.
60-MSD Eng-Building Permit Review (Required)
REVISION3/19/2018
Comments:
REVISION
60-MSD Eng-Building Permit Review (Required)
Denied 3/19/2018
Comments:
1 Other:1) In order to complete our review, please submit the following items to Jeff Chen at jeff.chen@cincinnati-oh.gov:
" Detention report and calculations.
" Private storm sewer and conveyance design calculations, if applicable.
" Miscellaneous calculations, modeling reports, drainage maps, and assumptions, as applicable.
60-MSD Eng-Building Permit Review (Required)
REVISION3/30/2018
Comments:
REVISION MADE
60-MSD Eng-Building Permit Review (Required)
Denied 4/2/2018
60-MSD Eng-Building Permit Review (Required)
Denied 4/2/2018
Comments:
1 Other:1) In order to complete our review, please submit the following items to Jeff Chen at jeff.chen@cincinnati-oh.gov:
" Detention report and calculations.
" Private storm sewer and conveyance design calculations, if applicable.
" Miscellaneous calculations, modeling reports, drainage maps, and assumptions, as applicable.
60-MSD Eng-Building Permit Review (Required)
Approved4/2/2018
60-MSD Eng-Building Permit Review (Required)
In Review2/27/2019
Comments:
NEED APPROVAL FOR EC
60-MSD Eng-Building Permit Review (Required)
Approved4/4/2019
124-SMU Stormwater Eng Review (Required)
ROUTED FOR REVIEW2/5/2018
Comments:
ROUTING SCREEN UPDATED - SMU
124-SMU Stormwater Eng Review (Required)
Denied 2/14/2018
Comments:
1) Detention: submit assumptions, calculations and drainage areas map. Show details on Utility Plan (where does it outlet into public sewers?). Note that any pipes within the Public R/W must be in DIP or RCP material.
2) Add the SMU Standard Plan Notes (See link https://www.cincinnati-oh.gov/stormwater/construction-and-design/standards/standard-plan-notes-updated-july-2017/)
3) Provide an erosion control plan (See link https://www.cincinnati-oh.gov/stormwater/construction-and-design/standards/sediment-and-erosion-control/)
Show protection for the Inlets located at Main St & 8th St to be installed before construction begins.
4) Show how roofs drain to sewer system.
5) Standalone Inlets are not permitted (Inlet # 3 on Sheet C200). Show complete flow route into the sewer system (pipe sizes, material and depths)
124-SMU Stormwater Eng Review (Required)
REVISION3/19/2018
Comments:
REVISION
124-SMU Stormwater Eng Review (Required)
Denied 3/20/2018
Comments:
All previous comments have been satisfactorily addressed except for Detention Calculations. Please email summary of your detention calculations to saidou.wane@cincinnati-oh.gov
Once received, SMU will sign off.

124-SMU Stormwater Eng Review (Required)
Approved3/28/2018
124-SMU Stormwater Eng Review (Required)
REVISION3/30/2018
Comments:
REVISION MADE
124-SMU Stormwater Eng Review (Required)
Approved4/2/2018
124-SMU Stormwater Eng Review (Required)
In Review2/27/2019
Comments:
NEED APPROVAL FOR EC
124-SMU Stormwater Eng Review (Required)
Approved3/18/2019
Comments:
Approved E.C.
80-Water Works Building Permit (Required)
ROUTED FOR REVIEW2/5/2018
Comments:
ROUTING SCREEN UPDATED - CWW
80-Water Works Building Permit (Required)
Cond. Approval2/13/2018
Comments:
DEMOLITION OF EXISTING BUILDING AND CONSTRUCTION OF NEW 10,000 SQF RESIDENTIAL APARTMENT BUILDING - SITE WORK AND CIVIL ENGINEERING work only

Water is presently not available

The C of O and/or sale of the water service will be withheld if the conditions of the approval are not met.

GCWW requires additional information to this project before approval of water availability can be considered.

- Site Utility Plan; include branch size(s) & location(s) of all existing and proposed water services. Submit through the Permit Center for routing and review.

- Verify the Fire Flow Demands at the street are the GPM @ 20 PSI required by the local Fire Department and Provide a current Flow Test. The flow test and fire flow demands are two different items. Consult your projects sprinkler contractor / plumber. Submit to jeffrey.koch2@gcww.cincinnati-oh.gov

- GCWW requires documentation (plat plan/site survey registered with Hamilton County Auditor), for the consolidation of parcels. Email to (jeffrey.koch2@gcww.cincinnati-oh.gov) or drop off at Engineering Branch Services counter, 4747 Spring Grove Av. Cincinnati Ohio 45232.

- 'LEED' certification; Notify GCWW of secondary water sources or the use of public water system as a makeup water source, Water Harvesting/Collection and/or cisterns, jeffrey.koch2@gcww.cincinnati-oh.gov

6" Fire branch #79845 is not metered, meter and proper backflow protection required. Owner/Developer will need to upgrade the existing 6" fire service branch #79845 to today's standards or Owner must sign FOD paperwork authorizing removal of existing water service branch before any new water service can be sold
Contact GCWW Field Services (513-591-7835) and GCWW Engineering Division Branch Services (513-591-7836) to discuss the processes.

The 1" domestic water service, branch #53691 is lead. In accordance with CMC Chapter 401 Division M, lead service lines must be replaced. (513-591-7836)

Casing and Corrosion Control (Streetcar) - If the fire and/or domestic water service is in the vicinity of the streetcar line, the owner/developer is required to follow corrosion control measures to protect service at owner/developer expense.

Contractor is responsible for locating and protecting all existing utilities prior to excavation and earthwork, notifying OUPS at 1-800-362-2764 and owners of underground utilities not registered with OUPS at least 2 working days prior to work.
Damage to existing utilities shall be immediately repaired at contractor's expense.

GCWW Conditions Disclaimer Paragraph is to be included with All Approved Building Permits Processed for Commercial:
This is a Conditional Approval that applies ONLY to the building permit. Greater Cincinnati Water Works (GCWW) review of the building permit does not approve water service branches, meters and backflow devices that may be shown or not on the building permits plans. All proposed water service branches, meters and backflow devices are handled through a SEPARATE APPLICATION PROCESS by the owner's license and bonded plumber at the GCWW Engineering Division, Branch Service Section, 4747 Spring Grove Avenue, Cincinnati Ohio, 45232, phone number (513) 591-7837. GCWW approval of this building permit is strictly limited to approval as to the general water availability as defined by GCWW at the street. Approval of this building permit does not grant or imply any approval to proposed LEED Certification / Green Initiative plans (cisterns, etc). In addition, GCWW does not approve of any private water main extensions, combination water services (fire, domestic, irrigation), use of public water system as a makeup water source, inside meter settings or precast large meter pits. Water service to any property is subject to all rules, regulations, and current practices and policies of the Greater Cincinnati Water Works.
80-Water Works Building Permit (Required)
REVISION3/19/2018
Comments:
REVISION
80-Water Works Building Permit (Required)
Cond. Approval3/26/2018
Comments:
The C of O and/or sale of the water service will be withheld if the conditions of the approval are not met.

GCWW requires additional information to this project before approval of water availability can be considered.

- Verify the Fire Flow Demands at the street are the GPM @ 20 PSI required by the local Fire Department and Provide a current Flow Test. The flow test and fire flow demands are two different items. Consult your projects sprinkler contractor / plumber. Submit to jeffrey.koch2@gcww.cincinnati-oh.gov

- GCWW requires documentation (plat plan/site survey registered with Hamilton County Auditor), for the consolidation of parcels. Email to (jeffrey.koch2@gcww.cincinnati-oh.gov) or drop off at Engineering Branch Services counter, 4747 Spring Grove Av. Cincinnati Ohio 45232.

- 'LEED' certification; Notify GCWW of secondary water sources or the use of public water system as a makeup water source, Water Harvesting/Collection and/or cisterns, jeffrey.koch2@gcww.cincinnati-oh.gov

6" Fire branch #79845 is not metered, meter and proper backflow protection required. Owner/Developer will need to upgrade the existing 6" fire service branch #79845 to today's standards or Owner must sign FOD paperwork authorizing removal of existing water service branch before any new water service can be sold
Contact GCWW Field Services (513-591-7835) and GCWW Engineering Division Branch Services (513-591-7836) to discuss the processes.

The 1" domestic water service, branch #53691 is lead. In accordance with CMC Chapter 401 Division M, lead service lines must be replaced. (513-591-7836)

Casing and Corrosion Control (Streetcar) - If the fire and/or domestic water service is in the vicinity of the streetcar line, the owner/developer is required to follow corrosion control measures to protect service at owner/developer expense.

Contractor is responsible for locating and protecting all existing utilities prior to excavation and earthwork, notifying OUPS at 1-800-362-2764 and owners of underground utilities not registered with OUPS at least 2 working days prior to work.
Damage to existing utilities shall be immediately repaired at contractor's expense.

GCWW Conditions Disclaimer Paragraph is to be included with All Approved Building Permits Processed for Commercial:
This is a Conditional Approval that applies ONLY to the building permit. Greater Cincinnati Water Works (GCWW) review of the building permit does not approve water service branches, meters and backflow devices that may be shown or not on the building permits plans. All proposed water service branches, meters and backflow devices are handled through a SEPARATE APPLICATION PROCESS by the owner's license and bonded plumber at the GCWW Engineering Division, Branch Service Section, 4747 Spring Grove Avenue, Cincinnati Ohio, 45232, phone number (513) 591-7837. GCWW approval of this building permit is strictly limited to approval as to the general water availability as defined by GCWW at the street. Approval of this building permit does not grant or imply any approval to proposed LEED Certification / Green Initiative plans (cisterns, etc). In addition, GCWW does not approve of any private water main extensions, combination water services (fire, domestic, irrigation), use of public water system as a makeup water source, inside meter settings or precast large meter pits. Water service to any property is subject to all rules, regulations, and current practices and policies of the Greater Cincinnati Water Works.
80-Water Works Building Permit (Required)
REVISION3/30/2018
Comments:
REVISION MADE
80-Water Works Building Permit (Required)
Cond. Approval4/3/2018
Comments:
Conditional Approval assigned on 3/26/2018, please refer to the comments made on 3/26/2018.
The C of O and/or sale of the water service can be withheld if the conditions of the approval are not met.
98-CONTRACTOR REGISTERED (Required)
Approved4/9/2018
13-Front Counter- Engnring Change (Optional)
Subtask Complete12/21/2018
Comments:
ENG CHNG BY SCRIPT
13-Front Counter- Engnring Change (Optional)
Approved12/21/2018
Comments:
EC DTD 12.21.18 SUBMITTED/ ALL TO SMC/ FEE
63-ENG CHANGE DENIED (Optional)
Subtask Complete12/21/2018
Comments:
EC DATED 12-21-2018
63-ENG CHANGE DENIED (Optional)
Subtask Complete2/11/2019
Comments:
Awaiting revision: change Prop MH to CIMH
13-Front Counter- Engnring Change (Optional)
Approved2/21/2019
Comments:
EC DTD 12.21.18 REVISED/ SHEETS/ ALL TO SMC/ FEE
62-ENG CHANGE APPROVED (Required)
Approved2/22/2019
Comments:
EC DATED 12-21-2018, STORM WATER REVISIONS
62-ENG CHANGE APPROVED (Required)
Approved2/27/2019
62-ENG CHANGE APPROVED (Required)
Approved2/27/2019
Comments:
DOTE approval of 2-21-19 engineering change
62-ENG CHANGE APPROVED (Required)
Approved3/18/2019
13-Front Counter- Engnring Change (Optional)
Approved3/18/2019
Comments:
EC DTD 12.21.18 AP AND READY / NOTIFIED BY EMAIL / $323.83 DUE / EC READY BIN
13-Front Counter- Engnring Change (Optional)
Approved4/4/2019
Comments:
EC DTD 12.21.18 PAID AND PICKED UP
64-ENG CHANGE WITHDRAWN (Optional)
No information availablen/a
99-FINAL COUNTER COMPLETE (Required)
Approved4/9/2018
99-FINAL COUNTER COMPLETE (Required)
Approved4/9/2018
Comments:
APPLICANT NOTIFIED BY PHONE CALL READY FOR PICK UP
No detailed information available for the approval of BPE - Adding Inspectns NA
1001-BPE-Additional Inspections Req (Optional)
Task Complete4/5/2018
1001-BPE-Additional Inspections Req (Optional)
Task Complete4/9/2018
1001-BPE-Additional Inspections Req (Optional)
Task Complete4/9/2018
1001-BPE-Additional Inspections Req (Optional)
Task Complete12/21/2018
1001-BPE-Additional Inspections Req (Optional)
Task Complete2/21/2019
1001-BPE-Additional Inspections Req (Optional)
Task Complete3/18/2019
1001-BPE-Additional Inspections Req (Optional)
Task Complete4/4/2019
54-PLANS SCANNED (Optional)
Task Complete2/5/2018
Comments:
PLANS SCANNED FOR ROUTING

Inspections:

Items Approved:
The following table lists Items Approved: along with the most current action taken on the Item.Items may be linked to a history of prior comments.This list of comments can be viewed by clicking on the Item link if present.
ItemDate:ActionComments
1-RESET INSPECTION4/4/2019Inspection Approval Set 
Items Not Approved:
The following table lists Items Not Approved: along with the most current action taken on the Item.Items may be linked to a history of prior comments.This list of comments can be viewed by clicking on the Item link if present.
ItemDate:ActionComments
990-Final Permit Inspection4/9/2019CommentEC issued on 4/04/19
5-Erosion Control in Place11/6/2018Partial Approval As required.
Additional Items:

Note: Some of the Additional Items listed below may not be applicable to this particular project.and therefore may not require an Approval/Inspection.The requirement is determined by the department on a per permit basis for the project

Please contact the Department to obtain more details

The following table lists additional items linked to this project.

ItemDescription
1001 EXPIRED - Permit is expired
20 Soil Inspection
27 Foundation Anchors
28 Damproofing/water proofing
40 Framing Inspection
50 Firestoping Inspection
900 Final Grading Inspection
910 Final Plumbing Inspection
982 MSD C of O Sign-off
983 CWW C of O Sign-off
984 SMU C of O Sign-off
991 Conditions Inspection
997 Plumbing Supervisor Sign-Off
999 Supervisor Approval